Tagged: #CGWA Compliance
Expert articles on groundwater compliance, CGWA norms, hydrogeology & sustainability.
4 articles
CGWA NOC Compliance: Level 1 and Level 2
The CGWA issued notices through its Bhuneer Portal to all NOC holders to submit the level 1and Level 2 compliances through its Bhuneer Portal. These notices have been issued to those who failed to submit the compliances timely. The CGWA NOC holders should comply to the directions of CGWA to avoid the heavy penalty for non-compliance.
CGWA Replaces NAW Affidavit with non availability of Water Supply Certificate
Many projects required to submit an affidavit on water non-availability to obtain a CGWA NOC under the CGWA Guidelines, 2020 (effective September 2020). This was used as a quicker alternative to avoid delays in getting certificates from local water authorities.
CGWA Reinstates Earlier System for Non availability of water Certificate Requirement
The Central Ground Water Authority (CGWA) has reinstated the earlier requirement of obtaining a Certificate of Non-Availability (NAW) or Partial Availability of Water from the ji concerned water supply agency.
Navigating Environmental Compliance: How to Handle a CGWA Show-Cause Notice Proactively
In the industrial manufacturing sector, water is often the lifeblood of daily operations.